Skip to content
Darvi Lab. Logo
Outsourcing

Switching Offshore DevelopmentVendors Without Downtime

Switching offshore development vendors: what to lock down before you give notice, and how handover really works on GitHub, AWS, the App Store and Play.

Nov 24, 20267 min read
DarviLabs Team
Switching Offshore Development Vendors Without Downtime
01

Secure every account before you give notice

The order of operations decides how expensive a vendor switch becomes. Before you tell your current offshore team you are leaving, you should already be the owner, not an administrator, of the GitHub organization, the cloud accounts, the registrar login and both app store accounts. Teams that give notice first spend the next six weeks asking a demotivated vendor for favours.

Build the inventory from the systems, not from the vendor's answer. Open your DNS zone and list every hostname that resolves, because each one points at something somebody is paying for. Read the CI configuration and list every service it authenticates to, then read the application's environment variables and list every third-party key. That list is your real asset register, and it is longer than the one in the proposal.

Ownership has a specific technical meaning in each system, and administrator access is not it. On GitHub you want an organization owner seat with billing in your name. On AWS you want the root credentials, or the management account that invited yours. On a domain you want the registrant account, not DNS editing rights. On Apple's side you want the Account Holder role, because App Store Connect's help is explicit that the Account Holder initiates a transfer and the receiving Account Holder accepts it.

Read the termination clause before you start, because the notice period is also your handover window. Thirty days of notice with no obligation to assist is not a handover clause. What you want written down is a paid, rate-capped advisory window running past the final day, and handover defined as completed tasks rather than delivered documents.

02

What a repository transfer moves, and what it quietly breaks

A GitHub repository transfer beats a mirror push, because it keeps the history a fresh repository throws away. GitHub's documentation states that issues, pull requests, the wiki, stars and watchers transfer with the repository, that commit information including contributions is preserved, and that links to the previous location are automatically redirected. Clone, fetch and push against the old URL keep working, though you should still run git remote set-url origin everywhere.

Three details in the same documentation cause most of the damage. If anyone creates a new repository or fork at the old location, the redirects are permanently deleted, so stale pipelines and submodules break weeks later with no obvious cause. GitHub Pages sites are not redirected, and GitHub warns about the risk of a domain takeover when DNS records still point at a Pages site that has moved. Packages may transfer or may lose their link to the repository depending on the registry, so check those separately.

The mechanics have preconditions too. The target account must not hold a repository of the same name, or a fork in the same network. A single repository forked from a private or internal upstream cannot be transferred at all, and a transfer into a personal account expires if the new owner does not accept within one day.

The line worth reading twice is that webhooks, services, secrets and deploy keys remain associated with the repository after the transfer completes. You inherit the outgoing vendor's CI credentials, deploy keys and webhook endpoints, still wired in and still working. Treat the transfer as the start of a credential rotation rather than the end of one, and give that rotation an owner and a date.

03

A cloud account can only be handed over if it can stand alone

Ask one question in week one: does production run in a cloud account that exists only for you, or in the vendor's account alongside their other clients? If it is the second, there is nothing to transfer. That is a migration with new account identifiers, new roles and a real cutover, and it is the largest hidden cost in a vendor switch.

If the account is genuinely yours, removing it from the vendor's AWS Organization still has conditions. The Organizations documentation is direct: you can remove an account only if it has the information required to operate as a standalone account, meaning a chosen support plan, verified contact information and a current payment method. Without those the call fails with ConstraintViolationException. An account the vendor created inside their organization cannot be removed until at least four days after creation, though invited accounts are exempt.

The moment of removal deserves planning. Restrictions imposed by service control policies are gone, so your roles may hold more permissions the day after than the day before, and tags on the account are deleted. The account loses access to its own cost and usage data for the period it was a member, while the vendor's management account keeps it, so export billing history before removal. The cross-account IAM role that gave the vendor access is not deleted automatically either, and AWS says it has to be removed by hand.

There is also no direct move between organizations. The account is removed, stands alone for a while, then accepts an invitation into yours, so plan for a window in which nobody depends on organization-level guardrails and decide beforehand who holds the root credentials during it.

04

Mobile apps move on the platform's terms, not on your schedule

App store transfers are the step most transition plans underestimate, because the platform sets the conditions, no contract overrides them, and an app sitting in review on your intended transfer date is a delay you cannot buy your way out of. App Store Connect's help lists criteria the app must meet: at least one version released to the App Store, and a status that is not Processing for Distribution, Waiting for Review, In Review, Accepted, Pending Developer Release or Pending Apple Release. In-app purchase product IDs cannot collide with those on any app already in the receiving account, and Apple Arcade apps cannot be transferred.

Things also have to be cleared or rebuilt around it. Apple's guidance is to turn off TestFlight testing, remove builds and testers, clear the test information fields and remove Xcode Cloud data first. The Apple Pay merchant ID is not transferred, and Game Center group membership and matchmaking configuration do not survive intact. The sending account keeps pre-transfer sales data, loses App Analytics for the app, and the app is removed from that account once the transfer completes, so take exports first.

Google Play has a different shape. Both accounts must be registered, active and compliant with Play policy, the target needs an active payments profile for paid apps or in-app products, and the request requires the registration transaction ID for both accounts, which somebody has to find in a years-old receipt email. Reviews, ratings, download statistics and subscriptions move across. Orders placed before the transfer stay with the original account, so refunds on them run through a vendor you have already parted company with. Earnings reports and test tracks do not transfer, so download the reports first. Links to Firebase, Google Cloud projects and AdMob are redone by hand, and Google says it responds within two working days once the target owner approves.

05

Knowledge transfer is a list of tasks, not a document

Stop asking for documentation. A departing team writes documentation describing the system it wishes it had built, and nobody can tell the difference until something breaks. Ask instead for a small number of tasks performed in front of you, because a task either completes or it does not.

Task one, the cold build: an engineer who did not write the code brings the project up on a clean machine using only the repository and the written instructions, while you time it. Task two, your deploy: one of your engineers ships to production with the vendor on the call but not driving. Task three, the restore: restore the production database from its latest backup into a scratch environment, and record what failed. Task four, the last three incidents: what broke, how it was detected, what changed.

Then collect the assets that live outside the repository, because this is where switches actually fail. Environment variable values for every environment. The state of every feature flag. A DNS zone export. The infrastructure-as-code state file and the backend holding it, since Terraform state in a bucket you do not own is a hard stop. Jobs and workers configured in a console rather than in code. Prompt templates, evaluation datasets and fine-tuning data behind AI features. Package registry namespaces, with recovery codes. And the manual steps somebody performs monthly that appear nowhere at all.

Two notes on timing. Lower DNS TTLs a week before any cutover, and export the zone file before you touch the registrar. Do not work from memory about lock windows: registrars have applied a sixty-day inter-registrar transfer lock after a change of registrant details, ICANN's transfer rules have been through a policy review, and practice varies, so get your registrar's answer in writing before committing to a date.

06

Working with Darvi Labs

Darvi Labs is a software engineering company based in Dhumbarahi, Kathmandu, working with product and engineering teams in the US, UK, EU, Australia and the Gulf. Our work is scalable web application architecture and agentic AI engineering, and both regularly mean picking up a system somebody else started, in the condition it is actually in rather than the one it was described in.

If you are planning a switch, the useful first move is a read of the repository and the accounts before anyone gives notice, so the inventory above is built from facts instead of assurances. You can see the kind of work we take on through the portfolio page, more engineering writing on the blogs page, and reach the team through the contact page.

Next step

Thinking through a similar decision?

Send us the constraint, the workflow, or the decision that keeps resurfacing. We can help clarify what should change first.

Start a conversation→